Contract Summary

  • Published Date: 14 January 2022

  • Tender Status: active

  • Tender Opening Date: 14 January 2022

  • Tender Closing Date: 28 January 2022

  • Award Date: n/a

  • Contract Start Date: n/a

  • Contract End Date: n/a

  • Contract is suitable for SMEs: Yes

  • Contract is suitable for VCSEs: No

  • Official Journal of the European Union (OJEU) Contract Type: Works

Print

Description

The Contractor (Align JV) has identified a package of works for the supply and installation of Primary Steel associated with our works on the Chiltern Tunnels Shaft Head Houses and Portal Buildings.

The scope of works will include the undertaking of shop drawings, manufacture, supply, delivery and required plant and cranage to install approx. 260T of primary steelwork. This includes all steel columns, beams and bracing elements supporting the roof and all connections to the headhouse and portal buildings RC elements. The subcontractor will be responsible for the connection design and the design of fixings between steelwork and RC elements.

The package will be competitively tendered and assessed against a split between commercial (price) and defined technical criteria.

In July 2017, ALIGN (Bouygues Travaux Publics, Sir Robert McAlpine and Volker Fitzpatrick) won the significant C1 package of the UK High Speed 2 line (HS2). Lot C1 consists of 21.6km of high speed rail infrastructure in a rural environment. This will include a 3.37km viaduct, 15.75km twin-tubes tunnel and five vent shafts handling both piston effect and tunnel ventilation.

About the Buyer

Contact name: Olivia Whaley

Address: Euston House, 24 Eversholt Street
London
NW1 1AD
UK

Telephone: 01698647999

Fax: n/a

Email: [email protected]

Value of Contract

Price Range: £1