Published Date: 13 November 2018
Tender Status: active
Tender Opening Date: 13 November 2018
Tender Closing Date: 23 November 2018
Award Date: n/a
Contract Start Date: n/a
Contract End Date: n/a
Contract is suitable for SMEs: Yes
Contract is suitable for VCSEs: No
Official Journal of the European Union (OJEU) Contract Type: Works
The Works:
The project works principally involves the work being done in two main stages. The stages may run concurrent but the new kitchen area must be completed prior to all other works. The Principal Contractor must submit a works programme at tender stage with a proposed start date.
The start of the two stages are dependent on permissions and agreement with NLB for operational reasons. Storage of materials on site to be kept to a minimum and delivered as required, storage area for material to be agreed on site with Base Manager.
More specifically, the main items of work with some guidance by NLB Engineers on sequence of operations are listed below: -
•Pre-survey (asbestos).
•Establish Welfare facilities.
•Set up site.
STAGE 1 Internal Alterations
•Strip out rooms and remove non-load bearing walls.
•Build new stud walls.
•First fix all services.
•Sheet out new studwork and skim plaster prior to decoration.
•Fit new flooring
•Install doors, skirting and architraves.
•Decorate internally.
•Install new kitchen.
•Final fix all services
•Clean down and clear site.
STAGE 2 Deck Work
•Prepare roof surface.
•Lay new decking.
Please refer to the tender documents for more detail.
A site visit is planned for Oban Depot on Wednesday 28 November 2018. All tenderers attending the site visit should contact Ruth Millan, Procurement Officer, Email: [email protected] by 1200hrs on Friday 23 November 2018 to confirm attendance including names and mobile number of representatives attending site.
Contact name: Ruth Millan
Address: 84 George Street
Edinburgh
EH2 3DA
UK
Telephone: 01314733104
Fax: n/a
Email: [email protected]