Published Date: 14 June 2018
Tender Status: active
Tender Opening Date: 14 June 2018
Tender Closing Date: 2 July 2018
Award Date: n/a
Contract Start Date: n/a
Contract End Date: n/a
Contract is suitable for SMEs: No
Contract is suitable for VCSEs: No
Official Journal of the European Union (OJEU) Contract Type: Works
After carrying five yearly electrical inspections of all communal area electrical circuits, it has been found that a general wiring of the stock was old and with inconsistent wiring colours and regulatory works back to the 16th edition it has been decided to upgrade all the wiring
The current wiring system is in 16mm metal conduit, buried in concrete which is usable but with upgrading, is unable to take anything bigger the 2.5mm single wiring.
It has been decided to use 25mm PVC white conduit internally in the building to create a new route for the wiring.
You will see by the testing certification that must of the Consumer units are of every type from BS3036 Re-wireble fuses to BS 60898 MCB. The requirement is to standardise so all the buildings are the same. But due to the complexity of the DNO system, only some buildings have consumer units and are feed using 2.5mm cabled looped through the loft space to feed the next building.
We have found that if we feed three blocks using the internal conduit the remaining block/s can be fed by an external conduit to the forth block to pick up a ground floor fitting and new internal PVC conduit and use the loft loop to feed the fifth block.
To bring the new wiring from the consumer unit to the internal light fittings, there is existing shallow trucking, but, the cams are worn, so you will need to open the lid to bring the wring to the light fitting and then fit the lid back by rivets
There is also a requirement to replace all internal lights with the approved specify lights from ASD, our approved lighting provider. This is to include upgrading the current spec from just amenity lighting to LED lighting with microwave lighting which is dimmable to 10% and in required locations 3 hour emergency lighting. They have also provided lighting designs for the light locations
A light is also required in the electrical cupboard which is also to be a 3 hour emergency light and you are to provide new tails from the meter to the consumer unit.
It has also been noted that the supplies to the door entry system will also be required to be replaced and to the first nearest high level (Approx 2.5 meters) external light using the existing conduit system. Some light are above this or will require new conduit, this will be assessed by the contracts administrator and a variation raised.
As part of the existing system, most blocks have one external light at each entrance to the building, this are call low level external light and not to be confused with the high level external lighting. These lights are to be replaced.
You will also be required to replace the existing photocell
Sheltered housing accommodation
Generally, this is to the general need accommodation standards, but some building has lifts, stair lifts and small power in communal areas.
You are to replace as above and to include the small power circuits which will have single MK Non-standard T Earth socket.
Currently...
Contact name: David Gray
Address: Promenade Cheltenham
Gloucestershire
GL50 9SA
United Kingdom
Telephone: 01242 387000
Fax: n/a
Email: [email protected]
Price Range: £1,080,000