Published Date: 28 June 2017
Tender Status: active
Tender Opening Date: 28 June 2017
Tender Closing Date: 21 July 2017
Award Date: n/a
Contract Start Date: n/a
Contract End Date: n/a
Contract is suitable for SMEs: No
Contract is suitable for VCSEs: Yes
Official Journal of the European Union (OJEU) Contract Type: Services
The stray current collection system for Supertram incorporates two measures to try and reduce the effects of current leaking from the rails, these two measures are:-
• Earth drainage diodes at the substations, creating a directional connection between the substation earth mat and the negative busbar
• Stray current collection system with associated drainage diodes.
As a result of work looking at the renewal of the Supertram system SYPTE request consultancy advice in order to understand the work required to float the Supertram system in order that the system meets current best practice in relation to the management of stray current.
Contact name: n/a
Address: 11 Broad Street West
Sheffield
S1 2BQ
England
Telephone: n/a
Fax: n/a
Email: [email protected]
Price Range: £20,000 - £20,000