Pure Vista specialises in architectural glass solutions designed to push the boundaries of modern construction. Our PosiGlaze and OriginGrip frameless glazing systems are quick and easy to install, robustly built, and offer an ideal solution for balustrades, balconies, staircases and terraces. As well as PosiGlaze and OriginGrip, Pure Vista offers a range of other specialist architectural glass products and services. So whether it’s a new build or a refurb, we can help deliver a seamless glazing solution.
You can find more details on our architectural glazing systems in the sections below. For further information, please head over to our website or get in touch directly on 01208 261 040.
The installation process is very simple, saving you time, money and effort which could all be spent on other areas of the construction project. All you need to do is adjust the bolt screw on both sides of the glass clamp to align the glass. Despite it being easy to install, PosiGlaze provides a strong, reliable barrier that complies with all British Building Regulations for balustrades, including:
The PosiGlaze installation process can be completed in six simple steps:
1. Fit the base channel to the substructure
2. Clip the glass slip clamps to the bottom edge of the glass panel
3. Place the bolt screws in the pivot clamp
4. Position the glass in the channel
5. Use the adjustment bolts to align the glass
6. Attach the cover strip and bead gasket
For full size illustrated instructions and installation videos, please head over to our website. If you would like any further information, please contact our sales team on 01208 261 040.
Pure Vista’s frameless glazing systems have been designed for minimal maintenance, but as with any aluminium product, they will need a certain amount of cleaning, especially if under the influence of salt water, industrial chemical plants, blast furnaces or other aggressive emission sources. In these cases, the aluminium ought to be cleaned at least every three months. In cleaner environments, every six months, and indoors, once a year. All grease and marks should be removed at installation, but DO NOT use abrasive materials such as wire wool. All bar ends, mitres, butt joints and drill holes should be coated with an air-drying primer to protect against corrosion, especially where the system is installed in coastal locations.
For more information on cleaning and maintenance, please visit Pure Vista online.
Info
Registration Number: | n/a |
VAT Number: | n/a |
Founded: | 1 January, 2006 (18 years and 2 months ago) |
No of Employees: | n/a |
Annual Turnover: | n/a |
Importers: | |
Exporters: | |
Company Type: |
|
Opening Times
Monday | 09:00 AM - 05:30 PM |
Tuesday | 09:00 AM - 05:30 PM |
Wednesday | 09:00 AM - 05:30 PM |
Thursday | 09:00 AM - 05:30 PM |
Friday | 09:00 AM - 05:30 PM |
Saturday | Closed |
Sunday | Closed |